Build story · United States · 2002–2023

SpaceX: cutting the cost of reaching orbit

After three failed launches nearly ended the company, SpaceX built cheaper rockets in-house, learned to land and reuse them, and came to dominate global launches.

By Shivam Bhandari · Reviewed 31 October 2026 · How we write

by the numbers

Failed Falcon 1 launches before success
3
NASA cargo contract (2008)
about $1.6 billion
Falcon 9 list price
around $60–70 million
Launches in 2023
close to 100

What happened

Elon Musk founded SpaceX in 2002 after concluding that rockets were expensive mainly because of how they were built, not because of materials. SpaceX made most parts in-house instead of buying them from aerospace suppliers.

Its first rocket, Falcon 1, failed three times between 2006 and 2008. Musk has said the company had money for only one more attempt. The fourth launch reached orbit in September 2008, and in December NASA awarded SpaceX a cargo contract worth about $1.6 billion — saving it.

SpaceX then pursued reusability. A Falcon 9 first stage landed in December 2015 and a used booster flew again in 2017. Reuse helped bring list prices to around $60–70 million per Falcon 9 launch, far below many competitors. By 2023 SpaceX was launching close to 100 missions a year, many carrying its own Starlink internet satellites.

Timeline

  1. 2002

    SpaceX founded.

  2. 2008

    Fourth Falcon 1 reaches orbit; NASA contract.

  3. 2015

    First Falcon 9 booster landing.

  4. 2017

    First reflight of a used booster.

  5. 2019

    First Starlink batch launched.

what made it work

  • Questioned why costs were high from first principles.
  • Vertical integration gave control over cost and speed.
  • Iterated quickly, accepting failures as tests.
  • Reusability changed the cost structure of the whole industry.

the lesson

Asking why a cost is so high — and refusing industry assumptions — can unlock order-of-magnitude improvements.

Apply it to your business

  1. 1Break your biggest cost into its parts and question each one.
  2. 2Bring critical components in-house if suppliers set your limits.
  3. 3Treat early failures as data, but keep enough cash to try again.